Despite provision for installation of fourth unit at the state-owned Lower Jhelum Hydro-power Project (LJHP) at Gantmulla here, the State Power Development Corporation (PDC) has failed to enhance its electricity generation capacity, resulting in loss of around 1500 lakh units of energy annually. Commissioned in 1977-78, with a generation capacity of 105 MW, the LJHP, according to reports, was designed in such a way that a fourth unit could be added to it to increase its capacity by 35 MW. However, despite passing of nearly four decades, the PDC has…
Read More